DPI Construction Projects

Page updated on Nov 17, 2021 at 3:58 PM

Ben Brenman Pond Retrofit

Phase: Construction

Project Description: Ben Brenman Pond, also called Cameron Station Pond, is located in Ben Brenman Park.  The Ben Brenman Pond Stormwater Management Retrofit Project retrofitted the existing "level 1" stormwater wet pond to a "level 2" stormwater wet pond.  This wet pond acts as a stormwater BMP to help filter pollutants, such as nitrogen, phosphorous, and sediment out of the stormwater that enters the pond.  

For more information, visit the  project webpage.

Contact Information: Demond Frazier, DPI Project Manager, demond.frazier@alexandriava.gov, 703.746.4632


Bridge Repair Projects: Eisenhower Ave. Over Cameron Run and Duke St. Over CSX Railroad

Phase: Construction

Project Description: The City is repairing the Eisenhower Avenue Bridge over Cameron Run and Duke Street Bridge over CSX railroad tracks. The long-term maintenance plan as well as bridge inspection reports are being utilized to develop repair plan for this project. The purpose of this project is to extend the service life of the bridges.

For more information, visit the project webpage.

Contact Information: Ayoub Hassen, DPI Project Manager,  ayoub.hassen@alexandriava.gov, 703.746.4635


Citywide Municipal Fiber Project

Phase: Construction

Project Description: The City is constructing its own fiber backbone infrastructure (broadband network) to support broadband services among the City's public institutions, including schools, libraries, public safety buildings, and other City facilities. In addition to improving connectivity among City facilities and sites, the Municipal Fiber project will create potential partnership opportunities to expand consumer choice and increase available speeds for broadband services available in Alexandria.  With the construction of the new fiber optic network, the City is planning to seek new partners who could lease excess conduit space to provide broadband service to residents and businesses. This would allow all providers to compete fairly and would encourage providers to offer consumer services. 

For more information, visit the project webpage.

Contact Information: Tafesse Gyes, DPI Construction Division Chief, tafesse.gyes@alexandriava.gov, 703.746.4051


Eisenhower Ave. Roadway Improvements

Phase: Construction

Project Description: This project includes the addition of a second left turn lane on westbound Eisenhower Avenue at the intersection of Eisenhower Avenue and Mill Road; enhancement of the receiving lanes on southbound Mill Road to align with the new intersection configuration; conversion of the traffic Circle at Eisenhower Avenue and Holland Lane into a T-intersection; resurfacing of the full width of Eisenhower Avenue between Mill Road and Holland Lane; and, installation of street lighting and sidewalk upgrades on the north side of Eisenhower Avenue between Mill Road and Elizabeth Lane, and both sides of Eisenhower Avenue between John Carlyle Street and Holland Lane. Construction is scheduled to begin in late Fall 2020 and will continue until Spring 2022.

View a video presentation on the project and the improvements planned for Eisenhower Avenue.

Additional information about this project is available on the Eisenhower Avenue Widening and Roadway Improvement Project webpage.

Contact Information: Demond Frazier, DPI Project Manager, demond.frazier@alexandriava.gov, 703.746.4632


Franklin St. Sanitary Sewer Relocation

Phase: Construction

Project Description: The Franklin Street Sanitary Sewer Relocation is relocating and replacing segments of an existing sanitary sewer main along Franklin Street between S Patrick Street and S Alfred Street. CCTV inspection of the sanitary sewer has shown plant roots causing residential sewer backups and structural damage to the sewer main. The project proposes to relocate a portion of the main into the road and replace other damaged portions.

Additional information can be found on the project webpage.

Schedule:  Construction is authorized to begin August 30, 2021. The contract duration is 150 calendar days.

Contact Information: Anup Gautam, DPI Project Manager,   anup.gautam@alexandriava.gov, 703.746.4155


Historic Ship Stabilization

Phase: Construction

Project Description: This project includes the stabilization and storage of three historic ship remnants excavated at the Robinson Landing Site (archaeological site 44AX235).  The overall goal of the project is to transport and store the timbers in Ben Brenman Pond (4800 Brenman Park Dr.) in a manner that preserves the possibility of future study and conservation when adequate funding and/or a location for permanent storage or display is available. Planning for the longer-term storage of the historic ship timbers began shortly after the ships were discovered in 2018. 

For more information, visit the project webpage and read more about the ships.

Contact Information: Matt Landes, DPI Project Manager, matthew.landes@alexandriava.gov, 703.746.4122


King St.-Old Town Metro Access Improvement Project

Phase: Construction

Project Description: The City of Alexandria, in coordination with the Washington Metropolitan Area Transit Authority (WMATA), is improving access to and safety around the King Street-Old Town Metrorail Station. The King Street-Old Town Metro Access Improvements Project will bring station access points and amenities in alignment with the City's  Vision Zero initiative. The new bus loop, pedestrian access infrastructure, and Kiss & Ride area will enable pedestrians and bicyclist move through enhanced station facilities, while also allowing buses to operate more efficiently. Additionally, the project includes new energy-efficient lighting in and increases the capacity of the storm sewer through the installation of larger, upgraded storm sewer pipes. Stormwater quality will now also be improved through underground stormwater treatment facilities that treat stormwater runoff from a previously untreated site.

For more information, visit the project webpage.

Contact Information: Reginald Arno, DPI Project Manager, reginald.arno@alexandriava.gov, 703.746.4631


N. Beauregard Sanitary Sewer Replacement

Phase: Construction

Project Description: The City of Alexandria is repairing damage to an existing 12-inch sanitary sewer main along 1200 block of North Beauregard Street. Past CCTV inspection of the sanitary sewer recorded structural damage and conveyance restriction in the 12-inch pipe. The issue was confirmed to be caused by a storm inlet along the sewer main. 

For more information, visit the project webpage.

Contact Information: Ayoub Hassen, DPI Project Manager, ayoub.hassen@alexandriava.gov, 703.746.4635


Oronoco Outfall Remediation and Maintenance

Phase: Construction

Project Description: The City is committed to addressing the environmental concerns associated with ATG – Oronoco site and has entered it into Virginia’s Voluntary Remediation Program (VRP). Securing the site and ensuring all program requirements are met requires ongoing testing, maintenance, and remediation, if necessary.

More information can be found on the Oronoco Outfall Remediation Project webpage.

Contact Information: Tafesse Gyes, Division Chief of Construction, tafesse.gyes@alexandriava.gov, 703.746.4051


Oronoco Remediation and Maintenance - Investigation and Long Term Planning

Phase: Design

Project Description: Coming Soon

Additional information can be found on the  project webpage.

Contact Information: Tafesse Gyes, DPI Construction Division Chief, tafesse.gyes@alexandriava.gov, 703.746.4051


Oronoco St. Storm Sewer Guard

Phase: Design

Project Description: Coming Soon

Additional information can be found on the project webpage.

Contact Information: Tafesse Gyes, DPI Construction Division Chief, tafesse.gyes@alexandriava.gov, 703.746.4051


Pedestrian Bridge Repair at 4600 Duke St.

Phase: Design - On Hold

Project Description: Coming soon

Contact Information: Ayoub Hassen, DPI Project Manager, ayoub.hassen@alexandriava.gov, 703.746.4635


Potomac Yard Metrorail Station

Phase: Construction

Project Description: Planning is underway to construct a new Metro Station along the Blue and Yellow lines on the east side of Potomac Yards. Information about the Potomac Yard Metrorail Station project can be found on the project webpages.

Contact Information: Daphne Kott, DPI Project Manager, daphne.kott@alexandriava.gov, 703.746.4055


Second St. Green Infrastructure Demonstration Project 

Phase: Construction

Project Description: The City is constructing a green infrastructure demonstration project along Second Street between North Pitt and North Royal Streets.  In line with the City’s  Eco-City initiatives, ‘Green infrastructure’ is an approach to managing stormwater by infiltrating it into the ground to recharge the groundwater rather than conveying it to the sewer system. The project will reduce the existing paved area and will create green space for trees and a series of bioretention facilities. 

Construction Update: The City of Alexandria contracted with Sagres Construction Corporation to construct the Second Street Green Infrastructure Demonstration (GID) Project. The project was proposed to take place on Second Street between North Pitt and North Royal Streets.  Work was scheduled to be completed this summer.  However, due to unexpected utility conflicts identified on Second Street and North Pitt Street, construction activities were suspended until further notice.  The City has been coordinating with utility companies and discussing options for the utility conflict.  We are evaluating project options based on the feasibility of remedying the conflict.  As soon as we have a recommended path forward, we will share that with the community.

Contact Information: Demond Frazier, DPI Project Manager, demond.frazier@alexandriava.gov, 703.746.4632


Wheeler Avenue Sewer Replacement

Phase: Construction

Project Description: Coming Soon

Additional information can be found on the project webpage.

Contact Information: David Le, DPI Project Manager, david.le@alexandriava.gov, 703.746.4058